VE Agent

Agent

Systematically generate and evaluate value alternatives—materials, assemblies, means & methods—to reduce cost and schedule without compromising performance, code, or aesthetics.

(This tool is currently under construction — features may evolve.)
Inputs: Models/specs, QTO, schedule Outputs: VE log, savings & impact analysis Integrations: Revit, ACC Cost/Schedule, estimating Time to Value: 2–5 weeks
Demo of VE Agent UI
Example: Alternative matrix comparing cost, time, performance, and carbon.

Material Substitutions

Propose alternates (e.g., façade systems, flooring, piping) with spec compliance notes and performance deltas.

Assembly Optimization

Compare wall/roof assemblies, prefabrication options, and fastening methods for cost, install time, and risks.

Means & Methods

Evaluate crane strategies, sequencing, and temporary works to shorten critical path or reduce site impacts.

Lifecycle Tradeoffs

Balance first cost vs. O&M, warranty, and sustainability metrics (energy/carbon) for informed decisions.

1) Intake

Import current design model/specs, QTO, and schedule milestones; capture constraints (code, aesthetics, warranty).

2) Opportunity Scan

Identify high-cost drivers and long-lead items; surface assemblies and details with outsized schedule/cost impact.

3) Generate Alternatives

Create curated alternates (materials, assemblies, methods) with spec clauses, vendors, and example details.

4) Analyze Impacts

Estimate cost deltas from QTO, schedule effects (lead time/installation), performance and carbon changes.

5) Compare & Select

Rank options by weighted criteria and stakeholder priorities; document risks, approvals, and required submittals.

6) Package & Handoff

Publish VE log with rationale, drawing/spec updates required, and change package for leadership/client sign-off.

Works With

Revit (models/schedules), ACC Cost/Schedule, estimating tools (Sage/WinEst), spec books, vendor catalogs.

Deliverables

VE log with cost/time/performance deltas, alternative matrix, recommended selections, implementation checklist.

Rule Sets

Client/market-specific VE rules (e.g., healthcare cleanability, school durability, hospitality acoustics).

Weighting Models

Customize scoring across cost, schedule, performance, carbon, and warranty to reflect stakeholder priorities.

Reporting

Tailor VE log columns, approval routing, and export templates for internal and client-facing packages.

-3–8%
Project first cost (typ.)
-2–6 wks
Critical path duration
Higher
Spec compliance & traceability
Stakeholder confidence in alternates