Standards Agent – Mockup
Standards Agent
Project: Mercy West Hospital • CAD/BIM Standards
Discipline: Arch
Version: v1.4
Rules: 128
Running
Drawings
Lineweights
Annotations
Title Blocks

Drawing Preview

Architectural CAD drawing preview
Sheet: A-501 Detail: Wall Section Scale: 3"=1'-0"

Rules (Filtered)

IDCategoryRuleSeverityStatusAction
ST-014Line WeightsProfiles ≥ 0.50mm; secondary 0.25mmHighCompliant
ST-028AnnotationsLeader arrows filled; text height 3/32"MedWarning
ST-041Title BlockNorth arrow present on plan sheetsLowCompliant

Auto-Checks (Last Run)

Sheets scanned: 42 Flags: 7 Autofix ready: 3
Most common: text height mismatch, missing scale on detail callouts.

Standards Health

Compliance
92%
Warnings
5
Critical
2
Last Scan
Today 10:12
Rule Detail — ST-014 • Line Weights
Standards rule detail preview
Category
Line Weights
Requirement
Profiles ≥ 0.50mm; secondary 0.25mm; hatch 0.13mm
Applies To
Sections, Elevations, Details
Auto-fix
Yes — applies pen table mapping
Notes
Verify title block scale text before bulk replot; check sheet set override.
Constructability Agent – Detailed Mockup
Constructability Agent
Project: Mercy West Hospital • Package: Core & Shell
Open Issues: 46
Critical: 9
Avg Resol. Time: 3.1d
Running
All
Critical
Clashes
Access
Tolerance
Sequence
Issue ID Severity Category Trade Location Description Clashes Predecessor Status Assignee Updated Action
CN-301 Critical Sequence Facade L03 Grid C4–C8 Panels scheduled before embed plates reach strength Concrete pour CW-E3 Blocked JP J. Patel Today 10:12
CN-308 Major Access MEP L02 Mech Rm Valve clearance < 18" behind duct run 2 Install duct D2 before valve V-17 Fail ML M. Lee Today 09:55
CN-312 Major Tolerance Structure L04 Core Sleeve offset exceeds ±10mm tolerance Set sleeves after rebar placement Warning TN T. Nguyen Today 09:20
CN-316 Critical Clash MEP/Steel L01 Bay B 4" sprinkler main through beam web opening 5 Coordinate hanger locations Fail KO K. O’Neal Today 08:42
CN-320 Minor Access Electrical Roof Penthouse Panel clearance infringed by ladder cage 1 Relocate ladder after panel install Warning ML M. Lee Yesterday 16:10
CN-327 Major Tolerance Concrete L02 Slab FF/FL values below spec in corridor Re-sequence pour with curing window Warning JP J. Patel Yesterday 14:03
CN-333 Critical Sequence Interiors L03 Wing A Gypsum install scheduled before inspection Rough-in inspection Fail TN T. Nguyen Mon 17:22
CN-340 Major Clash HVAC/Arch Level B1 VAV box conflicts with soffit depth 3 Lower soffit or offset duct Warning KO K. O’Neal Mon 10:11
CN-347 Minor Access Plumbing L02 Restrooms Cleanout behind casework, not accessible Shift casework blocking Warning ML M. Lee Fri 15:06
CN-351 Major Tolerance Steel Grid D5 Base plate out-of-level > 3mm Shim before column set Warning JP J. Patel Thu 13:58
CN-356 Critical Clash Elec/Fire L01 Lobby Conduit run conflicts with sprinkler head layout 4 Coordinate with RCP Fail TN T. Nguyen Thu 10:21
CN-362 Minor Access MEP Roof AHU access panel obstructed by guardrail 1 Relocate guardrail post Warning KO K. O’Neal Wed 11:44
Issue Details — CN-316 • Clash (MEP/Steel)
Clash snapshot detail
Location
L01 Bay B
Description
4" sprinkler main through beam web opening; hanger conflict.
Predecessor
Steel set complete before sprinkler mains
Clashes
5 (IDs: CL-8831..8835)
Proposed Fix
Offset main 150mm; adjust hanger location; verify load calc.
Assignee
K. O’Neal (Steel), M. Lee (MEP)
Reviewer Notes
Check fire rating impact at beam penetration; coordinate with RFI-247 attachments.
Scenario Agent – Detailed Mockup
Scenario Agent
Project: Mercy West Hospital • Package: Interiors – Level 03
Scenarios: 3
Best ΔCost: -4.2%
Best ΔTime: -11d
Running
Compare
Sensitivity
Risk
Scenario A
Baseline – Standard Spec
Scenario B
Alt Finish – Fast Cure
Scenario C
Modular Partitions
Budget: $18.2M
Schedule: 164d
Risk Index: 0.42
CO₂e: 1,240 t
Outcomes (Cost / Time / Risk)
View: Level 03 Fit-Out • Units: USD, Days
Scenario outcomes multi-metric chart
Sensitivity – Key Drivers
Labor rate, Lead time, Rework, Material Index
Tornado sensitivity visualization
Scenario CapEx Schedule Δ Cost Δ Time Risk Notes Choose
A – Baseline $18.2M 164d 0.42 Reference spec, standard lead times
B – Fast Cure $17.4M 153d -4.2% -11d 0.48 Faster install, slightly higher risk profile
C – Modular $18.9M 146d +3.8% -18d 0.37 Factory build, reduced on-site time
Cost delta waterfall chart

Assumptions (B vs A)

Labor Rate
-3%
Material Escalation
+1.5%
Lead Time
-10 days
Rework Allowance
-20%
Scenario Details — B: Fast Cure
CapEx
$17.4M (-$0.8M vs A)
Schedule
153 days (-11 vs A)
Risk Index
0.48 (labor availability sensitivity)
Top Drivers
Labor rate, lead time, rework rate
Notes
Requires vendor confirmation on curing compound availability and sample approvals by Week 4.
QA/QC Agent – Detailed Mockup
QA/QC Agent
Project: Mercy West Hospital • Package: Interiors – Finishes
Open: 72
Critical: 8
Avg Close: 2.7d
Running
Punchlist
Inspections
NCRs
Tests
Area
Trade
Status
Item ID Severity Category Trade Area / Location Description Status Due Assignee Photos Updated Action
QA-411 Critical Finish Defect Painting L03 Wing A – Room 3.214 Peeling at corner bead; humidity suspected Open Fri ML M. Lee 3 Today 10:18
QA-418 Major Alignment Drywall L03 Corridor C Reveal misaligned at door frames In Review Mon TN T. Nguyen 2 Today 09:44
QA-425 Minor Sealant Flooring L02 East Lobby Sealant bead inconsistent at base In Review Wed JP J. Patel 1 Today 08:27

QA Progress

Open
72
In Review
19
Resolved
28
Closed
56
QA progress donut chart

Defect Heatmap – Level 03

Plan heatmap of QA defects
Hotspots: Wing A Rooms 3.210–3.218 (finishes); Stair B L02 (firestopping)

Photo Evidence

QA photo 1 QA photo 2 QA photo 3
Item Details — QA-432 • NCR • MEP
QA evidence photo with markup
Area / Location
Mech Rm B
Description
Valve installed opposite flow direction; correct orientation marked.
Category
NCR
Severity
Critical
Status
Open (awaiting vendor sign-off)
Assignee
K. O’Neal (MEP)
Notes
Confirm flow arrow per submittal; add photo after correction. Schedule re-test within 24h.
Takeoff Agent
Project: Mercy West Hospital • Package: Interiors – Level 03
Packages: 5
Baseline: v1.8
Δ Cost (vs v1.8): -2.6%
Running
By Item
By Category
By Room
Item ID Spec / Type Unit Qty Waste Unit Cost Extended Δ vs Base Source Assignee Updated Action
TQ-3101 Floor Finish – LVT, 4mm sf 8,640 5% $3.85 $33,264 -2.1% Rooms: 3.200–3.260 • BIM tags JP J. Patel Today 10:18
TQ-3110 Base – Rubber, 4" lf 3,420 5% $1.12 $3,834 +0.7% Room perimeters • Rule set AO-9 ML M. Lee Today 09:52
TQ-3215 Partition – GWB 3-5/8" 1-hr lf 5,980 7% $9.20 $58,381 -1.4% Walls tagged F1 • Level 03 TN T. Nguyen Today 09:05
TQ-3240 Door – Solid Core ea 142 2% $225.00 $31,395 +1.2% Door schedule • Spec 08 14 16 KO K. O’Neal Yesterday 16:40
TQ-3312 Ceiling – ACT 24"x24" sf 10,950 5% $2.15 $23,543 -0.9% RCP areas • Model calc JP J. Patel Yesterday 14:12
TQ-3338 Ceiling – Gypsum Bulkhead lf 1,120 6% $6.85 $8,150 +0.5% Bulkhead edges • AO-12 ML M. Lee Mon 15:06
TQ-3410 Wall Tile – 6"x6" sf 1,540 8% $5.60 $9,331 -3.3% Restrooms only • Rooms tag R* TN T. Nguyen Mon 11:18
TQ-3452 Grout / Setting bag 188 5% $14.40 $2,707 Derived from tile sf KO K. O’Neal Fri 13:22
TQ-3520 Base – Stainless Corner ea 84 2% $9.40 $787 Corners auto-count JP J. Patel Fri 10:05
TQ-3575 Wall Protection – Crash Rail lf 940 5% $7.30 $6,859 +0.4% Corridor tags • AO-21 ML M. Lee Thu 16:48
TQ-3610 Paint – Walls, Level 03 sf 24,200 7% $0.85 $22,094 -1.1% Net wall area • Auto calc TN T. Nguyen Thu 10:44
TQ-3688 Paint – Ceilings, Level 03 sf 5,320 5% $0.72 $4,038 Ceiling net area KO K. O’Neal Wed 11:01
Line Item Details — TQ-3215 • Partition – GWB 1-hr
Scope
Level 03 • Rooms 3.200–3.260
Quantity
5,980 lf (incl. 7% waste)
Source
Walls tagged F1 • GWB partition tool
Assumptions
Openings netted; soffits excluded; shaft walls separate
Cost Basis
Vendor 2025Q3 • $9.20/lf
Notes
Cross-check with door count deltas; confirm firestopping at intersections handled under spec 07 84 13.
Spec Agent – Detailed Mockup
Spec Agent
Project: Mercy West Hospital • Division 08 – Openings
Sections: 12
Exceptions: 7
Linked RFIs: 3
Running
Spec
Exceptions
Conflicts

Spec Navigator & Preview MasterFormat • Division 08

08 10 00 Doors & Frames OK
08 11 13 Hollow Metal Doors Note
08 14 16 Flush Wood Doors OK
08 33 23 Overhead Coiling Doors OK
08 71 00 Door Hardware Exception
08 80 00 Glazing Note
08 87 00 Glazing Film OK
08 71 00 — Door Hardware
Clause §2.04.B • Page 3 of 12 • Rev 2
Spec clause detail diagram — door hardware
Title
Kickplates – Material & Thickness
Requirement
Stainless steel, #4 finish, min 0.05" thickness, height 10".
Found
Material specified; thickness omitted; height 10" noted.
Linked
A-601 • Door A-122 • Submittal S-2034
Reviewer Notes
Add thickness to clause; verify hardware set index includes kickplate line item; update submittal template accordingly.
Key: Exception requires approval • Note review

Exception Finder (Auto-Checks)

Fire Rating Mismatch
Door 1-hr specified; frame submittal indicates 45-min.
ADA Clearance
Pull-side clearance not shown in Room 3.214.
Hardware Set Index
Sets 01–14 referenced consistently across sheets.
Kickplate Spec
Material thickness missing from 08 71 00 §2.04.B.

Requirement Matrix – Spec ⇄ Model ⇄ Submittal

Scope
Level 03 • Doors A-101..A-142
Filters
Rated | ADA | Hardware Set
Requirement matrix heatmap

Cross-References (Specs ↔ Drawings ↔ RFIs)

Cross-reference network map
Hotlinks: A-601 Door Schedule • RFI-247 • Submittal S-2062

Linked Submittals

ID Title Status Spec Ref Updated Action
S-2062 Lighting Fixtures – Schedule Pass 26 51 13 Mon 14:27
S-2041 Firestopping Assembly – Level 05 Fail 07 84 13 Today 09:15
S-2034 Curtain Wall System – Type A Pass 08 44 13 Today 10:42
Change Impact Agent — Print Variant
Change Impact Agent
Project: Mercy West Hospital • Change: PR-047 — Door Hardware Revision
Δ Cost: +$142k
Δ Time: +6d
Impacted Trades: 4
Running
Overview
Scope
Contracts
Mitigations

Change Timeline

Change timeline with milestones
Origin: RFI-247
Linked: Submittal S-2041
Baseline: Sch v2.3 • BOQ v1.8
Window: Weeks 14–20
Impact IDSeverityTradeLocationDescription Δ CostΔ TimeDependencyStatusAssigneeUpdatedAction
CI-701CriticalDoorsWing A – L03 Hardware set change requires hinge/strike update+$58k+3d S-2034 approvalPending JP J. PatelToday 10:18
CI-708MajorElectricalWing A – Corr C Card reader backbox relocation+$14k+1d After frame setIn Review ML M. LeeToday 09:42
CI-742CriticalScheduleGlobal Lead time shift for hardware set B+$21k+2d Predecessor to punchlistAt Risk KO K. O’NealFri 17:01

Δ Cost / Δ Time — Waterfall

Cost/time deltas waterfall
Baseline → Adds → Credits → Net +$142k / +6d

Dependency Map

Dependency network map
Doors → Electrical → Security; Drywall precedes Doors

Risk Heatmap

Risk heatmap matrix
Highest: Lead time slip (Hardware B); Moderate: Card reader relocation
Change Details — CI-701 • Doors • Critical
Scope
Wing A – Level 03 • Doors A-101..A-142
Description
Hardware set change requires hinge/strike update and backset adjustment.
Δ Cost
+$58,000
Δ Time
+3 days
Dependencies
S-2034 approval → Frame rework → Hardware install → Access control
Mitigation
Pull forward submittal approval; pre-order alternates; add overtime to hold milestone M-12.
Procurement Agent – Detailed Mockup
Procurement Agent
Project: Mercy West Hospital • Package: Interiors – Level 03
Vendors: 12
Open POs: 31
Est. Savings: 4.6%
Avg Lead: 21d
Running
Sourcing
RFQs
Contracts

Sourcing Pipeline

Sourcing pipeline timeline / stages
RFQs Out: 5
Quotes Received: 9
Shortlist: 3
Negotiation: 2

RFQ Tracker

RFQScopeVendorsDueStatus
RFQ-118LVT & Base4FriOpen
RFQ-121Hardware B3ThuClosed
RFQ-124Ceilings ACT2MonOpen

Price Trends (Commodities)

Steel, Copper, MDF — last 6 months (vendor index baseline 1.00)
Open POs
By Vendor
By Package
PO Vendor Item Spec/Type Qty Unit Unit Cost Extended Δ vs Quote Lead Status Updated Action
PO-3021 Acme Floors LVT Finish 4mm, spec 09 65 13 8,640 sf $3.70 $31,968 -4.0% 12d Approved Today 10:14
PO-3026 NorthGate Doors Frames Hollow Metal, 1-hr 142 ea $198.00 $28,116 +2.8% 21d Pending Today 09:51
PO-3030 BrightGrid ACT Tiles 24"x24" 10,950 sf $2.05 $22,448 -1.6% 14d Approved Today 09:18
PO-3034 SecuriKey Cylinders Alt Supplier 142 ea $86.00 $12,212 -6.3% 9d Approved Yesterday 16:02
PO-3041 Metro Electric Card Readers Access Control 58 ea $312.00 $18,096 +1.1% 16d Pending Yesterday 13:40
PO-3047SpecLine MetalsCorner GuardsSS 84ea$18.20$1,5298d ApprovedMon 15:33
PO-3052Apex PaintWall PaintLow VOC 24,200sf$0.81$19,602-1.9%11d ApprovedMon 11:04
PO-3058TileWorksWall Tile6"x6" 1,540sf$5.35$8,239-2.3%13d ApprovedMon 10:12
PO-3063BrightGridGridMain & Cross 1,120lf$1.92$2,15015d ApprovedFri 17:11
PO-3069Acme FloorsRubber Base4" 3,420lf$1.05$3,591-3.1%10d ApprovedFri 14:18
PO-3074SecuriKeyStrikesANSI 142ea$19.40$2,755+0.6%9d PendingThu 12:33
PO-3081PlumbRightSealantLow-odor 188bag$13.90$2,6177d ApprovedThu 10:21
PO-3087SwitchProSwitchgear LabelsUL 58ea$4.60$2676d ApprovedWed 11:45

Supplier Risk

Supplier risk radar/spider chart

Contracts & Compliance

Contract/compliance checklist or matrix
Docs: MSA-2025 • PO Ts&Cs • COI (exp. Q4) • Warranty Forms
PO Details — PO-3026 • NorthGate Doors
Item
Frames — Hollow Metal, 1-hr
Qty / Cost
142 ea • $198.00/ea • $28,116
Lead / Ship
21 days • FOB Site • Partial allowed
Docs
UL Fire Label • COI • Warranty 2yr • Submittal S-2034
Notes
Confirm hinge/strike backset per PR-047; request expedited lot for Wing A if schedule slips.
VE Agent – Detailed Mockup
Value Engineering Agent
Project: Mercy West Hospital • VE Package: Interiors – Level 03
Options: 18
Shortlist: 6
Est. Savings: 5.8%
Running
Alternatives
Bundles
Submittals

Bundle Selector

Bundle
B-03: “Finish Swap + Doors”
Filters
ROI ≥ 15% • Feasible • No schedule slip
Alternatives scoring matrix

Bundle ROI & Trade Mix

Bundle ROI bars and trade mix
B-03 combines LVT spec change + alt hardware supplier; no schedule impact; minor QA check required.

Comparison — Cost / CO₂e / Schedule

Grouped comparison of cost, carbon, schedule
Baseline: v1.8
Bundle: B-03
ΔCost: -4.6%
ΔCO₂e: -8.2%
ΔTime: 0d

Risk vs Feasibility

Risk vs feasibility scatter

Shortlist (Apply or Park)

OptionSpecΔCostΔCO₂eΔTimeRiskFitStatusAction
VE-114 – LVT 4mm → 3mm 09 65 13 -$7,420 -3.1% 0d Low High Apply
VE-129 – Alt hardware supplier 08 71 00 -$12,860 -1.8% 0d Med High Apply
VE-133 – ACT tile spec change 09 51 13 -$2,410 -0.9% 0d Low Med Park
VE-141 – Door frame profile adjust 08 11 13 -$3,590 +1d Med Med Park
Option Details — VE-129 • Alt Hardware Supplier
Scope
Doors A-101..A-142 • Wing A L03
Savings
$12,860 (unit -6.3% vs base)
CO₂e
-1.8% (supplier transport & material mix)
Schedule
Lead 9d (no impact to milestone M-12)
Risks
Certification equivalence, warranty terms; add QA spot-check on first lot
Notes
Tie to PR-047 change; align with Submittal S-2034; include alternates clause in PO.
Submittal Agent – Compact Mockup
Submittal Agent
Project: Mercy West Hospital • Package: Exterior Envelope
Reviewed Today: 18
Pass: 13
Fail: 3
Pending: 2
All
Flagged
Awaiting Info
My Queue
Search
Discipline
Status
PassFailPending
Submittal ID Title Discipline Spec Section Result Key Notes Reviewer Updated Actions
S-2034 Curtain Wall System – Type A
Rev 2 • 12 pages • PDF
Architectural 08 44 13 Pass Meets NFRC U-value; wind load calc attached J. Patel Today 10:42
S-2041 Firestopping Assembly – Level 05
Rev 1 • 7 pages • PDF
Structural 07 84 13 Fail ASTM E814 report missing; VOC data incomplete M. Lee Today 09:15
S-2055 Air Handling Unit – AHU-3
Vendor: Climacore • Cut Sheet
Mechanical 23 73 13 Pending Awaiting electrical load data; returned with comments T. Nguyen Yesterday 16:02
S-2062 Lighting Fixtures – Schedule
Rev 3 • 18 items
Electrical 26 51 13 Pass DLC Premium listed; emergency circuits identified K. O’Neal Mon 14:27
Auto-Checks: 24 Passed Auto-Checks: 3 Failed Awaiting Info: 5 Avg Review Time: 6m 12s
Submittal Details — S-2041 • Firestopping Assembly (Level 05)
Spec Section
07 84 13 — Penetration Firestopping
Discipline
Structural
Supplier
FireGuard Systems
Submittal Type
Product Data & Test Reports
Result
Fail
Reviewer
M. Lee
Auto-Check Summary
12 Passed 2 Failed 1 Pending
Reviewer Notes
Request ASTM E814 / UL 1479 test report for proposed sealant at gypsum-to-concrete joint. VOC declaration must include g/L and calculation basis. If unavailable, propose alternate with complete documentation.
Permit Agent – Detailed Mockup
Permit Agent
Project: Mercy West Hospital • Package: Interiors
Submittals: 12
Pending: 3
Avg Review: 14d
Running
Timeline
Checklist
Reviews

Permit Timeline

Permit timeline

Checklist

ItemStatusReviewerDue
Fire Safety PlanApprovedJ. Patel
Energy CalcPendingM. LeeFri
AccessibilityRejectedK. O’Neal

Reviewer Activity

Reviewer activity feed

Application Status Board

Application status board

Document Submissions

Grid of submitted permit documents
Latest: Fire Safety Plan resubmitted Mon 10:42

Issues

IDDescriptionStatusUpdated
PR-118Incomplete structural calcPendingToday
PR-121Conflicting notes on plan sheetRejectedYesterday
PR-124Energy model missing appendixPendingMon
Permit Details — Fire Safety Plan
Type
Fire & Life Safety
Status
Approved • Resubmitted v2
Reviewer
J. Patel • Fire Dept
Dates
Submitted 7/12 • Reviewed 7/26 • Approved 7/28
Notes
Meets code with added smoke baffle at corridor junction.
4D Agent – Detailed Mockup
4D Agent
Project: Mercy West Hospital • Phase 2
Tasks: 1,242
Slippages: 18
On Track: 92%
Running

Schedule Timeline

Horizontal project timeline with bars and milestones

Task / Location Matrix

Task versus location matrix grid

Progress Heatmap

Progress heatmap by level and trade

4D Viewport (Model Overlay)

Abstract 3D building model with schedule overlay

Slippages

Bar/line hybrid slippages over time

Upcoming Milestones

IDMilestonePlannedΔTimeStatus
M-118Top-out Wing AAug 12+3dDelayed
M-124MEP Rough-InAug 28On Track
M-132Facade CompleteSep 22-2dAhead
Task Detail — MEP Rough-In
Cropped schedule detail highlighting one task
Scope
Level 03 – Wing B
Dates
Planned: 8/28 • Forecast: 8/28
ΔTime
0d
Linked
Submittal S-2021 • RFI-147
Notes
Predecessors cleared; verify scaffold removal before start.
Handover Agent – Detailed Mockup
Handover Agent
Project: Mercy West Hospital • Turnover Package
Assets: 3,842
Closeout Docs: 97%
Punchlist: 94% done
Running
Assets
Closeout
COBie
Digital Twin

Asset Register (Filtered)

Asset IDTypeRoomSerialWarrantyDocsCommissionedStatusAction
MECH-AHU-03Air Handling UnitM-305AHU3-9XJ21 Expires 2028-09-01O&M • Submittal • Test 2025-08-14Ready
ELEC-PNL-L3APanelboardE-312P3A-4421 Expires 2027-12-31O&M • Schedule 2025-07-26Ready
PLMB-PUMP-07Circulation PumpP-118CP-7A-88 Expires 2026-05-30O&M • Warranty 2025-08-02Docs Pending

Turnover Packages Overview

Turnover packages overview timeline
Packages: Mechanical • Electrical • Plumbing • Interiors • Site

O&M Manuals Preview

O&M manual thumbnails preview

Punchlist Completion

Punchlist completion chart
Open: 41In Review: 12Closed: 845

Training & Commissioning

Training and commissioning timeline
Sessions: Facilities Ops • Fire/Life Safety • BAS Controls • Preventive Maintenance

Sign-offs

Sign-offs responsibility matrix
Owner • Commissioning Agent • AHJ • GC • Architect • Engineer
Asset Detail — MECH-AHU-03
Location
Level 03 • Mech Room M-305
Links
COBie row • Digital Twin ID • O&M PDF • Test & Balance Report
Commissioning
Functional test passed 2025-08-14 • Report T&B-281
Warranty
ThermoAir • Parts & Labor • Exp. 2028-09-01
Notes
Attach QR label to access live O&M via mobile; verify PM schedule sync to CMMS.
Sustainability Agent – Detailed Mockup
Sustainability Agent
Project: Mercy West Hospital • v2.1 Sustainability Plan
Embodied C: 4,380 tCO₂e
Op Energy: 82 kBtu/sf/yr
Water: -26% vs baseline
Running
Embodied
Operational
Materials
Ratings

Embodied Carbon — Breakdown by System

Embodied carbon breakdown chart
StructureEnvelopeInteriorsMEP

Materials & EPDs

SpecMaterialSupplierEPDGWP (kgCO₂e/unit)QtyTotal tCO₂eStatusAction
03 30 00Concrete 4000psiRiverMix2024 • Mix A3201,980 yd³1,289 EPD Verified
05 12 00Structural SteelNorthSteel2025 • EAF1.78820 t1,460 Alt Supplier?
09 65 13LVT FlooringAcme Floors2025 • Low-VOC12.48,640 sf107 Preferred

Mitigation Scenarios (Top 3)

Scenario bars/stacked comparison
S1: 30% SCM in concrete • S2: EAF steel + recycled content • S3: Alt insulation w/ lower GWP

Operational Energy – 12 Months

Monthly energy trend
EUI: 82 kBtu/sf/yrTarget: 68Renewables: 18%

Water Use & Reuse

Water use & reuse graphic
Potable -22% • Irrigation -41% • Reuse +18% (cistern)

Rating Progress (LEED-style)

LEED-style points progress graphic
Pursuing: 62 ptsSecured: 44 ptsAt Risk: 8 pts
Material Detail — Structural Steel • 05 12 00
Supplier
NorthSteel • EAF route
EPD
EPD #NS-2025 • Third-party verified
GWP
1.78 kgCO₂e/kg (A1–A3)
Alternates
Mill B (EAF+renewables), Mill C (BOF w/ scrap)
Notes
Align with VE B-03; ensure mill cert and EPD alignment; confirm recycled content for credits.
Digital Twin Agent – Detailed Mockup
Digital Twin Agent
Project: Mercy West Hospital • Live Twin
Sensors: 12,480
Alarms: 14
Last Sync: 2m ago
Running

3D Twin Viewport

3D twin viewport

Sensor Layer Heatmap

Sensor layer heatmap

Systems Overview

SystemStatusLoadConditionAction
HVACStable68%Normal
LightingStable52%Normal
PlumbingMonitor74%High demand

Live Sensors

Live sensors

Performance Graphs

Performance graphs

Events / Alarms Timeline

Events timeline
System Detail — HVAC
Scope
Air Handling Units 01–06
Metrics
Temp 72°F • Humidity 45% • CO₂ 780ppm
Notes
Filter replacement due in 3 weeks; trending stable.
Safety Agent – Detailed Mockup
Safety Agent
Project: Mercy West Hospital • Safety Dashboard
Incidents: 4
Near Misses: 9
Days w/o LTI: 122
Running

Incidents Map

Incidents map with highlighted locations

Active Safety Issues

IDDescriptionStatusAssigned
SI-201Open trench unbarricadedCriticalForeman A
SI-208PPE non-compliance (visitors)PendingSafety Officer
SI-214Loose scaffolding tie-inCriticalForeman B

Checklist Compliance

Checklist compliance graphic

PPE Compliance

PPE compliance graphic

Training Tracker

Training completion progress graphic

Safety Alerts

Safety alerts feed cards
Incident Detail — SI-201
Type
Trenching / Excavation
Location
Wing C • Utility Corridor
Reported
07:42 • 2025-09-10
Notes
Barricades missing • Immediate corrective action required • Notify OSHA if unresolved by EOD.